PTQ Q1 2024 Issue


Challenges tochemical recycling of plastic waste
5

ptq&a
7

Adding CHP to refinery power infrastructures
17

Filtration and separation for industrial carbon capture, transport, and storage
23

Overcoming wastewater challenges of opportunity crude processing
29

Biofilm: A hidden threat
35

Simulating FCC upset operations
43

Refractory detection system and floating roof protection
49

Crude to chemicals: Part 2
55

Revolutionising refining with digital twins
63

Optimising nitrogen utilisation in refinery operations
69

Simulating VGO, WLO, and WCO co-hydroprocessing: Part 2
79

Considerations for crude unit preflash drums and preflash towers
85

Technology in Action
97

Powered by