Revamps 2024 Issue

a

b

c

d

e

f

Figure 5 Tray photographs as seen when the tower was opened in July 2022: a. Tray 10 top; b. Tray 10 underside; c. Tray 9 top; d. Tray 8 top; e. Tray 7 top; f. Tray 6 top

• Flooded and non-flooded gamma scans of both active areas and downcomers are invaluable for correctly diag - nosing tower problems. • Quantitative analysis of gamma scans provides concise information on liquid maldistribution between panels of two-pass or multi-pass trays. • Factors like plugging or damage that cause a seemingly

fairly small maldistribution of vapour between panels can lead to large variations in liquid splits to the panels. • Theories should be tested against plant tests, plant meas - urements, and gamma scans to obtain correct diagnostics. • Where fouling is expected, plugging-resistant tray designs with corrosion-resistant metallurgy should be applied. In wash sections, the tray design must resist downcomer unsealing.

22

Revamps 2024

www.digitalrefining.com

Powered by