Decarbonisation Technology November 2026 issue

SAF vs. Kerosene: Economic comparison Illustrative cost structure, price trajectory and ZCT waste-to-SAF development pathway

Indicative cost-stack comparison

Illustrative price trajectory and parity pathway

A

B

200

3.0

Jet kerosene (fossil-derived) SAF (market, various pathways) ZCT waste-to-SAF (target)

15 170 index

Feedstock cost Processing & H CapEx & overhead Carbon cost/credit

175

2.5

150

Kerosene baseline (84)

35

2.0

125

ZCT development target

Parity range (0.55–0.70)

100

1.5

18 10 6 84 index

85 index

65

5

75

20

1.0

50

48

0.5

55

50

25

12

0

0.0

Conventional jet kerosene

SAF (market today)

ZCT waste-to-SAF (target)

2022 2020

2024

2026 2028

2030

2032

2035

Year

Cost-driver waterfall: From SAF market cost to ZCT target

C

0 25 50 75 100 175 150 125 200

86

-58

Note: Illustrative indices for strategic comparison only; not audited costs or a commercial price forecast.

-22

-15

+10

85

84

85 index

Jet kerosene baseline

+ Premium (non-waste GTL)

– Waste feedstock (low/negative cost)

– Heat intregation services

– Cold-catalyst selectivity gain

+ CapEx amortisation

ZCT waste-to-SAF (target)

Figure 5 Indicative cost stack comparison: conventional kerosene, typical SAF today, and ZCT’s waste-to-SAF target. Values are illustrative, intended to show structural cost shift rather than audited figures

• Feedstock cost: Industrial waste gas and solid waste streams are low-cost or negative-cost inputs compared to purchased natural gas or crude, removing a major line item from the cost stack. • Process efficiency: Cold catalyst FT synthesis combined with plant-wide heat integration reduces the energy penalty historically associated with synthetic fuel production. • Selectivity and quality : Tuning the C 1 -C 16 product distribution towards the SAF-relevant carbon range reduces downstream upgrading costs and improves yield of on-specification fuel.

Cost and quality are treated as a single optimisation problem in ZCT’s process design, not two separate targets traded off against each other. A process that is cheap but produces an off-specification carbon distribution still fails the kerosene-parity test; the reactor and catalyst strategy is selected specifically to hold both criteria simultaneously (see Figure 5 ). From industrial waste to SAF: The five-year roadmap ZCT’s research programme treats solid and gas industrial waste as a combined resource

The five-year roadmap

Stage

Focus

Status

CCC pilot Scale-up

Flue gas capture and conversion validation at pilot scale Integration of CCC, clean H₂ generation, and FT synthesis

In progress (pilot plan active)

TRL 6-7

Process redesign

Shift from classical equipment to zero-carbon, heat-integrated design

Underway

Full-scale SAF

Waste-to-SAF production at commercial economics

5-year target

Table 1

www.decarbonisationtechnology.com

54

Powered by